Hugh Baird College Concrete Repairs

Hugh Baird College Concrete Repairs

Hugh Baird College Concrete Repairs

Hugh Baird College Concrete Repairs

The 49 year old 1970’s building was deteriorating, being close to the River Mersey with salt air, it’s coatings and joints were failing and corrosion was setting in affecting the re-bar in the concrete, causing it to spall creating a hazard.

Makers were contacted by the client and we initially recommended a make safe survey including testing, which included a Carbonation-Chlorides test.  This provided Makers with a full schedule of repairs and insight into the specification requirements to provide the best results…

See the .pdf for the full Concrete Repair Case Study…

Call us on 0845 899 4444 or email sales@makers.biz