Lakeside Shopping Centre Roof Refurbishment
Phase 3 of this 60,000m2 roof refurbish project, after many years of trying to repair the single ply system, the client decided on a full refurbishment with the inclusion of new walkways installed to highlight the safest route throughout the roof and provided a reinforced surface.
This phase included some of the most difficult areas to waterproof, 100’s of metres of roof area under plant and walkways. Lots of difficult and highly technical detail had to be overcome by the Makers Operatives.
See the .pdf for the full Roof Refurbishment Case Study…
Call us on 0845 899 4444 or email sales@makers.biz